Beaumont S.P. Depot – Built 1888 on Egan St. – long gone

General Article

Beaumont S.P. Depot - Built 1888 on Egan St. - long gone

This photo will have to do until I find a better one.

History of Beaumont
history.rays-place.com/ca/rs-beaumont.htm
History of Beaumont, California
From: History of Riverside County, California
with Biographical Sketches.
History By: Elmer Wallace Holmes
Historic Record Company.
Los Angeles, Califirnia 1912

The Ancestry Store

THE TOWN OF BEAUMONT

The town of Beaumont is located at the summit of the San Gorgonio Pass at a point where the valley widens considerably so that the distance is five to six miles between the foothills of the San Bernardino range on the north and the San Jacinto mountains to the south. The elevation of the town is estimated at 2,600 feet, Beaumont being the highest point on the Southern Pacific line between Los Angeles and Yuma. A most magnificent view of the mountains is afforded the residents of the place.

It has been seen that the very earliest known settlements of Spanish and later of whites in the pass were located in the northern part of what is now Beaumont, although there was no town at all at that place until about 1884, and then it was known as San Gorgonio. Its present name was received about 1887, when a company of capitalists purchased the lands in the townsite. Notwithstanding the fact that there was no town, a railroad depot and telegraph office were established there in 1875, and for many years this marked the summit of the pass.

In June of 1884 George C. Egan built his first store at San Gorgonio, near what is now the center of the town, on California avenue. Previous to that date Egan, who then had a store at Banning, had bought land from the railroad company and he sold his Banning property in order to make the last payment on this land, which comprised the odd sections in and about the present town of Beaumont. Egan also procured the other lands there, so that he owned practically the whole townsite. As soon as he had made his last payment and owned the property clear, he borrowed money on it and built the store, thus starting the town.

In 1884 also a man named Parrish built a tiny place south of the railroad track near the present location of the roundhouse, and kept a little store there. Egan had a postoffice in his store and was the first postmaster, although a man called "Old Man" Lamb handled the mail that was thrown off the trains for the residents for a short time, unofficially. Both stores, in common with many of the frontier stores of those days, kept liquor, though at that date there was no regular saloon in the town. The railroad station, a small red building, which housed the telegraph office as well, a turn table and water tank, which was then supplied from a well sunk by the railroad company, and a very few other buildings made up the town. The Summit house, the first hotel in Beaumont, which in a remodeled and enlarged … Read More

Walter Zenga On The Home Defeat To Barnsley

General Article



Wolves Head Coach, Walter Zenga’s post-match interview after the 4-0 defeat to Barnsley at Molineux in the Sky Bet Championship (13/09/16).

sourceRead More

home improvement diy

General Article

home improvement diy

Get ideas on home improvement diy at www.moneypit.com

Posted by Money Pit on 2011-08-16 11:15:54

Tagged: , home , improvement , diy … Read More

BCIN? Difference Between Designer, Architect and Engineer According to the Ontario Building Code

General Article

As I meet with new clients and friends every day, I commonly hear the same questions “What is a BCIN?” “When is a BCIN required?” etc. Here is some clarification to the public on some important issues about choosing a company to provide you with plans. Please note that this information applies only in the Province of Ontario.

What is a BCIN?

A BCIN stands for ‘Building Code Identification Number’. This number is assigned by the Ministry of Municipal Affairs & Housing, to successful applicants who have completed the requirements outlined in Division C Section 3.2 of the Ontario Building Code. There are two distinct types of BCIN number, individuals & firms. Individuals are people who have completed the exams and have received a BCIN from the MAH; however, they do NOT carry any insurance. As a result this limits the types of projects that the person can do. Firm BCIN’s on the other hand MUST carry valid liability insurance, and depending on the amount of designs fees that a firm charges in a year will dictate the required amount of insurance coverage they must have. Insurance is expensive but it is there to protect you so avoid working with companies who do not have it. For most people, a home is your single largest asset; do you really want to get plans from someone without insurance?

How do I know if I am choosing a registered company?

The Ministry of Municipal Affairs & Housing maintains a database of all registered BCIN holders. The registry is available through a system called QUARTS. Once on the Public Registry, this system allows you to search by the individual’s name, the company’s name or the BCIN #. Once you have found a business or individual, it will bring you to a page with details on the company. It lists the mailing address of the business & contact details. At the bottom it should also show the Registration as ‘Registered Designer’ and the Status as ‘Current’. If it shows up as ‘lapsed or expired’ then this means that they either do not have valid insurance for that year, or that they are late in filing their paperwork.

Do I need an architect or engineer for my project?

Probably not! There have been massive changes to the system in the last few years, opening the doorway for a new title; designers. Architects & Engineers are NOT required for any project less than 600m² (6,458 sq.ft.) and less than 4 storeys. For most residential and small commercial projects, you do NOT need an architect or an engineer. However, and this is important, if the project involves severe structural modifications, an engineer may be requested by the municipality to review the plans. On this note, there is a BCIN exam which will supersede this requirement! If your design company is a registered company in the Category of ‘Building Structural’ then they can complete the plans.

When do I need a BCIN ‘stamp’ for my project?

Depending on … Read More